Remove Module Control Carrier(S) - Avaya DEFINITY Server R Manual

Upgrades and additions
Hide thumbs Also See for DEFINITY Server R:
Table of Contents

Advertisement

Upgrading a Multicarrier G2 Universal Module to Avaya
DEFINITY Server R EPN running Avaya MultiVantage
Software
Follow Routine Preventive Maintenance
Follow routine preventive maintenance procedures on the system to be upgraded.
For information about the procedures and necessary equipment, refer to the
"Preventive Maintenance" section in Maintenance for Avaya MultiVantage
DEFINITY Server R.
Label Cables
To make reconnecting the cables simpler and more reliable, label both ends of the
connector cables associated with the carrier to be removed.

Remove Module Control Carrier(s)

Check Link Status
1. Type display communication-interface links and press
all enabled links.
2. Type status link number and press
3. Write down which links are in service.
Disable TTI
!
CAUTION:
If you do not disable the TTI, the translations can be corrupted.
1. Make sure the ISDN is in service. If not, attempt to busy out and release
the ISDN D-channel/link. This will bring the ISDN trunks back into service.
2. Type change system-parameters features and press
3. On the second screen, set the Enabled? field to n to prevent the TTI
feature from activating.
Power Down G2 System
At the power distribution unit, set the main circuit breaker to OFF.
5-44
Issue 5 October 2002
Enter
. Repeat this step for all links.
Enter
Enter.
. Write down
555-233-115

Advertisement

Table of Contents
loading

Table of Contents