Removing The Driven Half-Pulley Bearing - APRILIA SR MAX 125 ie Service Station Manual

Table of Contents

Advertisement

SR MAX 125 ie

Removing the driven half-pulley bearing

- Check there are no signs of wear and/or noisiness; - Replace with a new one if there are.
- Remove the retainer ring using two flat blade screwdrivers.
- Support the pulley bushing adequately from the threaded side using a wooden surface.
- Using a hammer and pin, knock the ball bearing out as shown in the figure.
- Support the pulley properly using the bell as shown in the figure.
Specific tooling
001467Y035 Bell for 47-mm outside diameter bearings
- Remove the roller bearing using the modular punch.
Specific tooling
020376Y Adapter handle
020456Y Ø 24 mm adaptor
Engine
ENG - 99

Advertisement

Table of Contents
loading

Table of Contents