APRILIA SR MAX 125 ie Service Station Manual page 175

Table of Contents

Advertisement

SR MAX 125 ie
Injection
Verificare la presenza di tensione fissa tra cavetto
Rosso-Blu dello zoccolo teleruttore e massa. In
caso contrario verificare la continuità del cavetto
Rosso-Blu tra scatola portafusibili (N° 5 10 A) e lo
zoccolo teleruttore.
NOTE
CONTINUITY TESTS MUST BE CARRIED OUT WITH THE
COMPONENTS DISCONNECTED. (REMOTE CONTROLS,
ELECTRONIC CONTROL UNIT, FUSES, ETC.).
pump circuit 6
Check, on switching to "ON", that there is battery
voltage, for about two seconds, to the Black-Green
cable of the pump connector and ground with
pump connector disconnected. Otherwise, check
the continuity of the Black-Green cable between
the pump connector and the remote control base.
Check the efficiency of the ground line of the fuel
pump by measuring the continuity between the
pump connector black cable, system side, and the
ground.
If, when switching to "ON", the pump continues to
turn after two seconds of activation, check, with the
control unit disconnected and the injection load re-
INJEC - 175

Advertisement

Table of Contents
loading

Table of Contents