SR MAX 125 ie
Specification
Recommended fluid
Sealing pressure
Specification
Starts opening at
Specification
Electric ventilation starts at
Electric ventilation stops at
Specification
Control
Specification
Specification
Calibration
System bleed
- Start up the engine until the operating tempera-
ture is reached.
- Remove the rubber hood over the bleed valve
- Obtain a rubber tube that is of the right length to
connect the valve to the expansion tank
- Place one end of the pipe on the bleed valve and
the other in the expansion tank
- Loosen the screw by two turns until the commu-
nication hole is revealed with the head as shown
in the picture
- Wait until only coolant comes out of the rubber
pipe so as to eliminate any air bubbles inside the
circuit.
- Tighten the bleed valve respecting the maximum
torque.
- Bring the coolant up to the correct level inside the
expansion tank
Locking torques (N*m)
THERMOSTAT
Type
ELECTRIC VENTILATION
WATER PUMP
Type
RADIATOR
Type
EXPANSION TANK
Desc./Quantity
AGIP PERMANENT SPEZIAL (ready for use)
Cap calibrated at 0.9 bar
Desc./Quantity
Wax-type, with deviator
85 ± 2°C
Desc./Quantity
100° C
90° C
Desc./Quantity
Centrifugal
Electric, commanded by the control unit
Desc./Quantity
Aluminium, with horizontal circulation
Desc./Quantity
Automatic bleeding, in parallel with the radiator
Cooling system
COOL SYS - 247