Ford 2003 Mustang Workshop Manual page 1627

Hide thumbs Also See for 2003 Mustang:
Table of Contents

Advertisement

Installation
1. Install the upper intake manifold gasket.
2. Install the intake manifold and bolts in the sequence shown.
3. Install the PCV valve-to-intake manifold tube.
4. Connect the vacuum hoses and the electrical connector to the EGR vacuum regulator solenoid.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents