86. Tighten the EGR tube to the exhaust manifold.
87. Connect the barometric pressure (BARO) sensor electrical connector.
88. Install and connect the positive crankcase ventilation (PCV) hose.
89. Install the PCV valve.
90. Install the vacuum accessory bracket and the mounting bolts.