Dipswitch Setup - JUKI AMS-210E Series Engineer's Manual

Hide thumbs Also See for AMS-210E Series:
Table of Contents

Advertisement

(2) Dipswitch setup

SDC board
MAIN board
1. The penetration force is increased when "4" of
Dipswitch SW1
.
2. If the penetration force is insufficient for thick materi-
als, this switch should be turned ON.
3. All other dipswitches should be turned OFF.
(Caution) Dipswitch changeover should be done af-
ter the power supply has been turned off.
4. All dipswitches on the MAIN board are turned OFF.
– 173 –
is turned ON on the SDC board

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents