Chapter 5. Installation; Unpacking; Meeting Spacing Requirements - Advanced Energy Pinnacle User Manual

20 kw (325-650 vdc) devicenet, ae bus, mdxl user, terminal block output
Table of Contents

Advertisement

Installation

UNPACKING

Unpack and inspect your Pinnacle power supply carefully. Check for obvious physical
damage. If no damage is apparent, proceed with the unit connections. If you do see
signs of shipping damage, contact Advanced Energy Industries, Inc., and the carrier
immediately. Save the shipping container for submitting necessary claims to the
carrier.

MEETING SPACING REQUIREMENTS

See Figure 5-1 on page 5-2 for a graphical representation of the spacing requirements.
• The clearance between either side of the Pinnacle supply and the enclosure must
be 76 mm (3 in).
• The clearance between the top of the Pinnacle supply and the top of the enclosure
must be 25 mm (1 in).
• No clearance is required between power supplies.
• The clearance between the rear of the Pinnacle supply and the enclosure must be
102 mm (4 in), with adequate ventilation.
5702156-E
Pinnacle™ 20 kW
Installation
Chapter
Chapter
5
5-1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents