70 Nm (7.0 m
10 Nm (1.0 m
LT
LS
2
Order
Removing the oil baffle plates and
bearings
Connecting rod assemblies
Crankshaft/crankshaft journal bearings
Transmission
1
Oil baffle plate
2
Oil delivery pipe
3
Plate
4
Oil baffle plate
5
Bearing
10
kg, 50 ft
lb)
•
•
kg, 7.2 ft
Ib)
•
•
LT
4
8
3
5
Job/Part
5 - 83
CRANKCASE
12 Nm (1.2 m
LT
LT
1
7
Q'ty
Remarks
Remove the parts in the order listed.
Refer to "CONNECTING RODS AND
PISTONS".
Refer to "CRANKCASE".
Refer to "TRANSMISSION".
1
1
1
1
1
ENG
11
9
kg, 8.7 ft
Ib)
•
•
6