(Iii)Installment Steps - ATV 200 Service Manual

Four-wheeled cross-country vehicle
Table of Contents

Advertisement

(III)Installment steps

The opposite steps of "Disassembly"is the
mounting steps. The following must be paid
attention when mounting:
1.Lubricate the inner surface of bushing sub-
assembly ¢Ù .(Lubrication oil is lithium base
grease).
2.Fix nut
Nut torque:45Nm
Caution
Must ensure the correction of bolt mounting
direction of left /right front wheel fork, bolt
head position is the position showing on the
drawing¢Ùfront, behind¢Ú that make the bolt
head is outward.
A means the vehicle is forward.
3.Mount left/right front seat assy ¢Ù
4.Fix the nut ¢Úof left/right front seat assy.
Attached: Nut torque :25Nm
- 104 -

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents