216 Port InfiniBand FDR Switch Platform Hardware Installation Guide
Push the latch release.
Step 1.
Step 2.
Step 3.
1.9
Inserting a Management Module
Step 1.
Step 2.
Step 3.
Push the latch release.
Mellanox Technologies
Figure 14: Ejector Latch
Leaf
Start with the latch fully open, that is 45
Carefully set the leaf board into the side guide rails and slowly slide the board
into the chassis.
Catch the hooks onto the vertical bar and push the latch shut.
Start with the latches fully open, that is 45
Carefully seat the management module into the slot and slowly slide the board
into the chassis until the ejectors begin to engage on the chassis edge.
Press the ejectors inward until the locks snap. This indicates that the board is
fully seated.
Figure 15: Ejector Latch
Management Module /Spine
Leaf
o
to the front panel of the leaf.
o
to the front panel of the leaf.
Management Module /Spine
Rev 1.0
23