Installing The Leafs; Inserting A Management Module; Figure 24: Ejector Latch - Mellanox Technologies MIS5600Q-10DNC Installation Manual

648 port infiniband qdr switch platform
Hide thumbs Also See for MIS5600Q-10DNC:
Table of Contents

Advertisement

648 Port InfiniBand QDR Switch Platform User Manual
4.
Repeat steps 1- 3 for the second cable holder.
1.7

Installing the Leafs

The leaf boards can be installed in any of the available leaf slots.
Push the latch
release
1.
Start with the latch fully open, that is perpendicular to the front panel of the leaf.
2.
Carefully set the leaf board into the side guide rails and slowly slide the board into
the chassis.
3.
Catch the hooks onto the vertical bar and push the latch shut.
1.8

Inserting a Management Module

1.
Start with the latches fully open, that is perpendicular to the front panel of the leaf.
2.
Carefully seat the management module into the slot and slowly slide the board into
the chassis until the ejectors begin to engage on the chassis edge.
3.
Press the ejectors inward until the locks snap. This indicates that the board is fully
seated.
Mellanox Technologies

Figure 24: Ejector Latch

Leaf
Ejector
Leaf
Rev 2.1
33

Advertisement

Table of Contents
loading

Table of Contents