Figure 4-4. Sidecar Conduit And Wire Entry Locations - Eaton 93PM Installation And Operation Manual

Eaton 93pm ups 60–100 kw (480v)
Table of Contents

Advertisement

Top Entry Conduit Landing for AC
Input and Output, and DC Input
(Remove panel to drill or punch
conduit holes.)

Figure 4-4. Sidecar Conduit and Wire Entry Locations

Eaton 93PM UPS (60–100 kW, 480V) Installation and Operation Manual P-164000227—Rev 2
Front
UPS with Left-Mounted Sidecar
Front
UPS with Right -Mounted Sidecar
UPS System Installation
Top Entry Conduit Landing for AC
Input and Output, and DC Input
(Remove panel to drill or punch
conduit holes.)
www.eaton.com/powerquality
4-7

Advertisement

Table of Contents
loading

Table of Contents