Eaton 93PM Installation And Operation Manual page 43

Eaton 93pm ups 60–100 kw (480v)
Table of Contents

Advertisement

6.
Turn each jacking bolt consecutively, two full turns, until the pallet skids clear the floor by approximately
3 mm (1/8").
7 .
Remove the hardware loosened in Step 4.
8.
If a sidecar is installed to the UPS, remove the hardware loosened in Step 5.
9.
Pull the pallet skids out from under the metal angle supports without disturbing the jacking bolts. Recycle
the pallet skids and hardware in a responsible manner.
CABINET MAY FALL. Do not loosen the hardware attaching the front supports to the cabinet base.
The cabinet must be lowered by the jacking bolts before the supports can be removed.
10. Carefully and evenly lower the cabinet by turning each jacking bolt consecutively two full turns
(maximum) until the casters contact the floor and the cabinet is no longer supported by the jacking bolts.
11. After the UPS is resting on the floor, remove the jacking bolts and floor protectors. Recycle them in a
responsible manner.
12. Remove the cabinet support bolts fastening the front, rear, and side cabinet supports together and
remove the side supports (see Figure 4-1).
13. If a sidecar is installed to the UPS, remove the bottom screw securing the sidecar front panel. Lift the
panel straight up to remove from the panel hanger brackets at the top of the cabinet.
14. If a sidecar is installed to the UPS, remove the sidecar mounting bolts holding the front and rear sidecar
supports to the cabinet base (see Figure 4-2)
15. Remove the cabinet mounting bolts holding the front and rear supports to the cabinet base (see
Figure 4-1).
16. If installing the cabinet permanently, retain the cabinet mounting bolts; otherwise, recycle the bolts along
with the support brackets in a responsible manner.
17 . Close the door and secure the latch.
18. If the leveling feet are not retracted, turn all four leveling feet until they are retracted as far into the cabinet
as possible.
To prevent tipping when rolling the cabinet, push the cabinet from the rear whenever possible.
19. Roll the cabinet to the final installation location.
NOTE
Use the leveling feet to level and lock the cabinet in place.
20. Secure the UPS in position by lowering the leveling feet until the cabinet is level and locked in place.
21. If permanently mounting the UPS, proceed to Step 22; otherwise, continue to Step 25.
22. Locate the two floor mounting brackets from the parts kit.
23. Using the retained cabinet mounting bolts, install the floor mounting brackets to the front and rear of the
UPS with the angle facing outward.
24. Secure the cabinet to the floor with customer-supplied hardware.
25. Proceed to paragraph 4.3
Eaton 93PM UPS (60–100 kW, 480V) Installation and Operation Manual P-164000227—Rev 2
CAUTION
CAUTION
www.eaton.com/powerquality
UPS System Installation
4-3

Advertisement

Table of Contents
loading

Table of Contents