UPS System Installation
Figure 4-6. UPS with Sidecar Conduit and Wire Entry Locations
4-12
Eaton 93PM-L UPS (20–120 kW, 208V) Installation and Operation Manual P-164000688—Rev 02
Top View
(Rear Vent Option)
Top Entry Conduit Landings
for Customer Interface Wiring
(Remove panels to drill or punch
conduit holes.)
Front
Top Entry Conduit Landing for AC
Input and Output, and DC Input
(Remove panel to drill or punch
conduit holes.)
Bottom Entry Conduit Landings
for Customer Interface Wiring
(Remove panels to drill or punch
conduit holes.)
Bottom Entry Conduit Landing
for AC Input and Output
(Remove panel to drill or punch
conduit holes.)
Bottom Entry Conduit Landing
for DC Input
(Remove panel to drill or punch
conduit holes.)
www.eaton.com/powerquality