Table 3-6. Power Cable Conduit Requirements - Eaton 93PM Installation And Operation Manual

Eaton 93pm ups 60–100 kw (480v)
Table of Contents

Advertisement

Conduit sizes were chosen from NEC Table 4, Electrical Metallic Tubing (EMT). See Table 3-6 for conduit
requirements.
Per NEC article 300, 3(B)(1), all three-phase conductors must be run in the same conduit. Ground must be run
in the same conduit as the phase conductors.
Conduit is sized to accommodate one ground conductor sized in accordance with NEC Table 250.122.
Conduit sizes listed are for copper wiring only.

Table 3-6. Power Cable Conduit Requirements

UPS Model
UPS Rating
Eaton 93PM-100
Eaton 93PM-100
Eaton 93PM-100
Eaton 93PM-100
Eaton 93PM-100
100 kW
Eaton 93PM UPS (60–100 kW, 480V) Installation and Operation Manual P-164000227—Rev 2
Voltage
480 Vac
AC Input to UPS Rectifier and Bypass
60 kW
DC
480 Vac
AC Input to UPS Rectifier and Bypass
70 kW
DC
480 Vac
AC Input to UPS Rectifier and Bypass
80 kW
DC
480 Vac
AC Input to UPS Rectifier and Bypass
90 kW
DC
480 Vac
AC Input to UPS Rectifier and Bypass
DC
Terminal
(A, B, C, Ground)
AC Output (Four Wire)
(A, B, C, Ground)
Battery
(Positive, Negative, Ground)
(A, B, C, Ground)
AC Output (Four Wire)
(A, B, C, Ground)
Battery
(Positive, Negative, Ground)
(A, B, C, Ground)
AC Output (Four Wire)
(A, B, C, Ground)
Battery
(Positive, Negative, Ground)
(A, B, C, Ground)
AC Output (Four Wire)
(A, B, C, Ground)
Battery
(Positive, Negative, Ground)
(A, B, C, Ground)
AC Output (Four Wire)
(A, B, C, Ground)
Battery
(Positive, Negative, Ground)
UPS Installation Plan and Unpacking
Number of Wires
Minimum Conduit
in Conduit
Trade Size
4
1-1/4
4
1-1/4
3
1-1/2
4
1-1/2
4
1-1/4
3
2
4
1-1/2
4
1-1/2
3
2
4
2
4
1-1/2
3
2
4
2
4
1-1/2
3
2-1/2
www.eaton.com/powerquality
Number of
Conduits
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
3-13