Figure 4-14. Wire Tie Anchors; Figure 4-15. Building Alarm Terminal Block Connector Assignments; Table 4-2. Building Alarm Connections And Wire Terminations - Eaton 93PM Installation And Operation Manual

Eaton 93pm ups 60–100 kw (480v)
Table of Contents

Advertisement

Figure 4-14. Wire Tie Anchors

Table 4-2. Building Alarm Connections and Wire Terminations

Terminal Name
10
Building Alarm 1
9
Building Alarm 1 Return
8
Building Alarm 2
7
Building Alarm 2 Return
6
Building Alarm 3
5
Building Alarm 3 Return
4
Building Alarm 4
3
Building Alarm 4 Return
2
Building Alarm 5
1
Building Alarm 5 Return
Building Alarm 5 Return
Building Alarm 5
Building Alarm 4 Return
Building Alarm 4

Figure 4-15. Building Alarm Terminal Block Connector Assignments

Eaton 93PM UPS (60–100 kW, 480V) Installation and Operation Manual P-164000227—Rev 2
Description
Input: Programmable UPS alarm, activated by a remote dry
contact closure
Input: Programmable UPS alarm, activated by a remote dry
contact closure
Input: Programmable UPS alarm, activated by a remote dry
contact closure
Input: Programmable UPS alarm, activated by a remote dry
contact closure
Input: Programmable UPS alarm, activated by a remote dry
contact closure
UPS Building Alarms
1
2
3
4
7
8
5
6
Wire Tie Anchors
Twisted Pair Wires
Twisted Pair Wires
Twisted Pair Wires
Twisted Pair Wires
Twisted Pair Wires
9 10
Building Alarm 1
Building Alarm 1 Return
Building Alarm 2
Building Alarm 2 Return
Building Alarm 3
Building Alarm 3 Return
www.eaton.com/powerquality
UPS System Installation
Wire Size
Tightening Torque
2 lb in
(0.23 Nm)
#1630 AWG
2 lb in
#1630 AWG
(0.23 Nm)
2 lb in
#1630 AWG
(0.23 Nm)
2 lb in
#1630 AWG
(0.23 Nm)
2 lb in
#1630 AWG
(0.23 Nm)
4-17

Advertisement

Table of Contents
loading

Table of Contents