Figure 18. Sidecar Conduit And Wire Entry Locations - Eaton 93PM Installation And Operation Manual

400v/480v four-wire 100 kw frame
Table of Contents

Advertisement

UPS System Installation

Figure 18. Sidecar Conduit and Wire Entry Locations

Top View
(Rear Exhaust Option)
Top Entry Conduit
Landing for AC
Input and Output,
and DC Input
Top Entry Conduit
Landings for Customer
Interface Wiring
Front
Bottom Entry Conduit
Landings for Customer
Interface Wiring
Bottom Entry Conduit
Landing for AC
Input and Output,
and DC Input
Bottom View
NOTE: Remove panels to drill or punch conduit holes.
60
Eaton 93PM UPS (400V/480V Four-Wire – 100 kW Frame) Installation and Operation Manual 164000566—Rev 04

Advertisement

Table of Contents
loading

This manual is also suitable for:

93pm series93pm-50-293pm-50-1

Table of Contents