UPS System Installation
Sidecar Rear
Cabinet Support
Figure 4-2. Removing the Sidecar Pallet Skids and Supports – Eaton 93PM UPS
4.3
Integrated Battery Cabinet Installation
If installing Integrated Battery Cabinets (IBCs), refer to the Eaton 93PM Integrated Battery Cabinet Installation
Manual listed in paragraph 1.8 for installation instructions.
After the IBC is installed, proceed, to paragraph 4.4 if installing an Sidecar Integrated Accessory Cabinet-Bypass
(SIAC-B), or to paragraph 4.5 if installing an Integrated Accessory Cabinet-Distribution (IAC-D); otherwise,
proceed to paragraph 4.6 to complete the wiring of the UPS.
4.4
Sidecar Integrated Accessory Cabinet-Bypass Installation
If installing an SIAC-B, refer to the Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass Installation and
Operation Manual listed in paragraph 1.8 for installation instructions.
After the SIAC-B is installed, proceed to paragraph 4.5 if installing Integrated Accessory Cabinet-Distribution;
otherwise, proceed to paragraph 4.6 to complete the wiring of the UPS.
4.5
Integrated Accessory Cabinet-Distribution
If installing Integrated Accessory Cabinet-Distribution (IAC-D), refer to the Eaton 93PM Integrated Accessory
Cabinet-Distribution Installation and Operation Manual listed in paragraph 1.8 for installation instructions.
After the IAC-D is installed, proceed to paragraph 4.6 to complete the wiring of the UPS.
4-4
Eaton 93PM UPS (60–100 kW, 480V) Installation and Operation Manual P-164000227—Rev 2
Sidecar
Pallet Skid
Sidecar Skid
Mounting Bolts
(2 places front)
(2 places rear)
Sidecar Front
Cabinet Support
Sidecar
Mounting Bolts
(2 places front)
(2 places rear)
www.eaton.com/powerquality