Eaton 93PM 150 kW SIAC-B Three-Wire Installation And Operation Manual
Eaton 93PM 150 kW SIAC-B Three-Wire Installation And Operation Manual

Eaton 93PM 150 kW SIAC-B Three-Wire Installation And Operation Manual

Sidecar integrated accessory cabinet-bypass
Hide thumbs Also See for 93PM 150 kW SIAC-B Three-Wire:
Table of Contents

Advertisement

Eaton
® ®
93PM Sidecar Integrated Accessory Cabinet-Bypass
150 kW SIAC-B Three-Wire
150 kW SIAC-B Four-Wire
200 kW SIAC-B Three-Wire
200 kW SIAC-B Four-Wire
Installation and Operation Manual
p/n: P-164000387
Revision 08

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 93PM 150 kW SIAC-B Three-Wire and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Eaton 93PM 150 kW SIAC-B Three-Wire

  • Page 1 Eaton ® ® 93PM Sidecar Integrated Accessory Cabinet-Bypass 150 kW SIAC-B Three-Wire 150 kW SIAC-B Four-Wire 200 kW SIAC-B Three-Wire 200 kW SIAC-B Four-Wire Installation and Operation Manual p/n: P-164000387 Revision 08...
  • Page 2 National Fire Protection Association, Inc. ERIFLEX and FLEXIBAR are registered trademark of Erico International Corporation. All other trademarks are property of their respective companies. ©Copyright 2013-2018 Eaton, Raleigh, NC, USA. All rights reserved. No part of this document may be reproduced in any way without the express written approval of Eaton.
  • Page 3 4.8 Installing SIAC-B External Power Wiring ......................54 4.9 Initial Startup ............................62 4.10 Completing the Installation Checklist......................62 4.11 Installation Checklist..........................62 Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 4 9 9 W W a a r r r r a a n n t t y y ............................................................9 9 1 1 9.1 Limited Factory Warranty for Three-Phase Eaton 93PM UPS and 93PM UPS Accessory Products......91 Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 5 Eaton 93PM 200 kW UPS with SIAC-B (Three or Four Wire) Dimensions (Front View)......... 16 Figure 8. Eaton 93PM 200 kW UPS with SIAC-B (Three or Four Wire) Dimensions (Top and Bottom Views) ....17 Figure 9. Eaton 93PM 200 kW UPS with Left-Mounted SIAC-B (Three or Four Wire) – Center of Gravity...... 18 Figure 10.
  • Page 6: Table Of Contents

    Eaton 93PM 150 kW or 200 kW SIAC-B (Three or Four Wire) Breakers – Left-Mounted SIAC-B..... 82 Figure 55. Eaton 93PM 150 kW or 200 kW SIAC-B (Three or Four Wire) Breakers – Right-Mounted SIAC-B ....83 Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 7 External Input Power Cable Terminations for the Eaton 93PM 200 kW Four-Wire SIAC-B......31 Table 10. SIAC-B Interface Wiring Terminal Block Terminations................47 Table 11. SIAC-B MBP Interface Terminals ...................... 48 Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 8 List of Tables viii Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 9 Right-mounted four breaker configuration containing a MBP with auxiliary contacts, a MIS, a BIB, and a RIB – Left-mounted two breaker configuration containing a MBP with auxiliary contacts and MIS Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 10 Left-mounted four breaker configuration containing a MBP with auxiliary contacts, a MIS, a BIB, and a RIB Figure 1. Eaton 93PM SIAC-B (Three or Four Wire) Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 11 Figure 2. Eaton 93PM 150 Capacity UPS with SIAC-B (Three or Four Wire) 150 kW UPS with 150 kW UPS with Left-Mounted Sidecar Right-Mounted Sidecar Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 12 Information notes call attention to important features or instructions. [Keys] Brackets are used when referring to a specific key, such as [Enter] or [Ctrl]. Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 13 Installation instructions, including site preparation, planning for installation, wiring and safety information, and detailed illustrations of cabinets with dimensional and connection point drawings Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 14 E E q q u u i i p p m m e e n n t t R R e e g g i i s s t t r r a a t t i i o o n n Please visit www.eaton.com/pq/register to register your new Eaton UPS / Eaton UPS Accessory. Model Number: Serial Number: Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 15 Keep surroundings uncluttered, clean, and free from excess moisture. • Observe all DANGER, CAUTION, and WARNING notices affixed to the inside and outside of the equipment. Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 16 Safety Warnings Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 17 The system must be installed in a temperature and humidity controlled indoor area free of conductive contaminants. Failure to follow guidelines may void your warranty. The basic environmental requirements for operation of the SIAC-B are: Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 18 Three-Wire SIAC-B (4-Breaker) 765 (1685) 734 (1618) 8 at 92 (202) 200-4 Three-Wire SIAC-B (4-Breaker) 828 (1825) 797 (1758) 8 at 100 (220) Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 19 862 (1900) 831 (1833) 8 at 104 (229) 200-4 The clearances required around the SIAC-B are the same as the attached UPS. Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 20 Figure 4. Eaton 93PM 150 kW Capacity UPS with SIAC-B (Three or Four Wire) Dimensions (Front View) UPS with Left-Mounted SIAC-B UPS with Right-Mounted SIAC-B Dimensions are in millimeters [inches] Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 21 Front View View Front Front Bottom Bottom View View UPS with Left-Mounted SIAC-B UPS with Right-Mounted SIAC-B Dimensions are in millimeters [inches] Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 22 819 (36.2) 509 (20.0) 510 (20.1) 618 (1363) Eaton 93PM-150-3 Capacity UPS with 4-Breaker SIAC-B 989 (38.9) 511 (20.1) 524 (20.6) 682 (1503) Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 23 909 (35.8) 551 (21.7) 414 (16.3) 646 (1425) Eaton 93PM-200-3 UPS with 4-breaker SIAC-B 977 (38.5) 549 (21.6) 402 (15.8) 710 (1566) Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 24 Figure 7. Eaton 93PM 200 kW UPS with SIAC-B (Three or Four Wire) Dimensions (Front View) UPS with Left-Mounted SIAC-B UPS with Right-Mounted SIAC-B Dimensions are in millimeters [inches] Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 25 Front View View Front Front Bottom Bottom View View UPS with Left-Mounted SIAC-B UPS with Right-Mounted SIAC-B Dimensions are in millimeters [inches] Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 26 Installation Plan and Unpacking Figure 9. Eaton 93PM 200 kW UPS with Left-Mounted SIAC-B (Three or Four Wire) – Center of Gravity Dimensions are in millimeters [inches] Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 27 Installation Plan and Unpacking Figure 10. Eaton 93PM 200 kW UPS with Right-Mounted SIAC-B (Three or Four Wire) – Center of Gravity Dimensions are in millimeters [inches] Weight and Center of Gravity with Left-Mounted 200 kW Three-Wire SIAC-B (letters A, B, and C map to...
  • Page 28 902 (35.5) 567 (22.3) 533 (21.0) 768 (1693) Eaton 93PM-200-4 UPS with 4-Breaker SIAC-B 960 (37.8) 565 (22.2) 514 (20.2) 831 (1833) Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 29 The 93PM 150 kW Capacity UPS is shown with a left-mounted SIAC-B. A UPS with a right-mounted SIAC-B is the mirror image. Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 30 The 93PM 150 kW Capacity UPS is shown with a left-mounted SIAC-B. A UPS with a right-mounted SIAC-B is the mirror image. Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 31 The 93PM 200 kW UPS is shown with a left-mounted SIAC-B. A UPS with a right- mounted SIAC-B is the mirror image. Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 32 Do not check SIAC-B operation by any action that includes removal of the earth (ground) connection with loads attached. • Refer to national and local electrical codes for acceptable external wiring practices. Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 33 Table 2 Table 3. Wire sizes listed are for copper wiring only. Table 2. External Power Wiring Recommendations: Eaton 93PM 150 kW and 200 kW Three-Wire SIAC-B – Two and Three Breaker Maintenance Bypass Rating 60 Hz Units...
  • Page 34 Installation Plan and Unpacking Table 2. External Power Wiring Recommendations: Eaton 93PM 150 kW and 200 kW Three-Wire SIAC-B – Two and Three Breaker Maintenance Bypass (Continued) AWG or kcmil Minimum Conductor Size (Phase A, B, and C) Number per Phase...
  • Page 35 Operation manual, listed in paragraph 1.7 For More Information, for the appropriate conductor and upstream breaker size. Table 4. External Power Wiring Recommendations: Eaton 93PM 150 kW and 200 kW Four-Wire SIAC-B – Two and Three Breaker Maintenance Bypass Rating 60 Hz Units...
  • Page 36 Installation Plan and Unpacking Table 5. External Power Wiring Recommendations: Eaton 93PM 150 kW and 200 kW Four-Wire SIAC-B – Four Breaker Maintenance Bypass Rating 60 Hz Units Basic Unit Rating Input/Output Voltage Volts 480/480 480/480 Maximum Amps AC Input to Maintenance Bypass (3) Phases, (1) Neutral –...
  • Page 37 2 – #6–300 31 (275) 5/16" Hex Phase C 2 – #6–300 31 (275) 5/16" Hex Neutral 2 – #6–300 31 (275) 5/16" Hex Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 38 Eaton. Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 39 Interface wiring can be installed using the inter-cabinet wiring access pass-through or by routing wiring through conduit between cabinets. • Install the interface wiring in separate conduit from the power wiring. Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 40 Information, for inspection and unpacking instructions. Figure 15. Eaton 93PM 150 kW UPS with SIAC-B (Three or Four Wire) as Shipped on Pallet Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 41 Installation Plan and Unpacking Figure 16. Eaton 93PM 200 kW UPS with SIAC-B (Three or Four Wire) as Shipped on Pallet Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 42 Installation Plan and Unpacking Figure 17. Eaton 93PM Field Installed SIAC-B as Shipped on Pallet Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 43 For the following steps, verify that the forklift or pallet jack is rated to handle the weight of the cabinet (approximately 220 kgs/486 lbs). To remove the pallet: Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 44 Loosen, but do not remove, the skid mounting bolts holding the pallet skids to the front and rear supports, and to the left and right side supports (see Figure 18). Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 45 18. If the leveling feet are not retracted, turn all four leveling feet until they are retracted as far into the cabinet as possible. NOTE In line-up-and-match installations, the SIAC-B and UPS cabinets should be located as shown in Figure 2 Figure Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 46 13. Proceed to paragraph 4.4 Electrically Connecting the UPS Cabinet and SIAC-B. Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 47 In the UPS cabinet, locate the harness cable ends marked UPS Output. Connect marked phase A, B, and C cable ends to the corresponding output terminals of the UPS. Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 48 14. In the SIAC-B, locate the cable with the Red Anderson connector and connect to the Red Anderson connector mounted to the cabinet sidewall (see Figure 20 Figure 21). 15. Proceed to paragraph 4.4.2 Installing SIAC-B Interface Connections Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 49 Output Neutral to UPS (Gray Connector) (Four-Wire Model Only) Bypass Neutral to UPS (Red Connector) (Four-Wire Model Only) Ground Terminals Ground Terminals Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 50 Output Neutral to UPS (Gray Connector) (Four-Wire Model Only) Bypass Neutral to UPS (Red Connector) (Four-Wire Model Only) Ground Terminals Ground Terminals Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 51 Figure 23. 93PM SIAC-B BIB Output Terminal Detail Phase A (BIB-2) AC Output to Phase B (BIB-4) UPS Bypass Phase C (BIB-6) Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 52 1.7 For More Information, for the UPS pass-through location. Connect the MBP interface harness green ten position header to the SIAC-B green terminal block. Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 53 4.7 Two-Hole Barrel Lug Terminations to Bus Bar Installation. Figure 25. 93PM 150 kW Three-Wire and Four-Wire SIAC-B Interface Terminal Location Interface Terminal Block Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 54 Installation Figure 26. 93PM 200 kW Three-Wire and Four-Wire SIAC-B Interface Terminal Location Interface Terminal Block Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 55 Strip wire insulation back 10 millimeters to wire terminal blocks. Use wire rated for 600V and Class 1 wiring methods. Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 56 UPS Building Alarm is programmed to monitor Normally Open (NO) contacts. “Return“ indicates connection to electronics circuit ground. “Common” indicates connection to common side of isolated relay contact Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 57 Installation Figure 28. 93PM 150 kW Three-Wire and Four-Wire SIAC-B UPS MBP Interface Terminal Location MBP Interface Terminal Block Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 58 Installation Figure 29. 93PM 200 kW Three-Wire and Four-Wire SIAC-B UPS MBP Interface Terminal Location MBP Interface Terminal Block Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 59 4 4 . . 5 5 . . 1 1 E E l l e e c c t t r r i i c c a a l l l l y y D D i i s s c c o o n n n n e e c c t t i i n n g g t t h h e e U U P P S S C C a a b b i i n n e e t t a a n n d d S S I I A A C C - - B B To disconnect wiring: Verify the UPS system is turned off and all power sources are removed. Refer to the applicable Eaton 93PM UPS Installation and Operation manual, listed in paragraph 1.7 For More...
  • Page 60 UPS terminals. Refer to the applicable Eaton 93PM UPS Installation and Operation manual, listed in paragraph 1.7 For More Information, for terminal locations and requirements. Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 61 Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 62 Route the maintenance bypass input, critical load output, and rectifier input (if installed) cables (phase A, B, and C, Ground, and if required Neutral) through the conduit on the top of the SIAC-B to the SIAC-B Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 63 20. After the SIAC-B is wired, return to the applicable Eaton 93PM UPS installation and operation manual, listed in paragraph 1.7 For More Information, to complete the UPS wiring. Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 64 Bottom View Bottom Entry Conduit Landing (Remove plate to drill or punch conduit holes.) UPS with Left-Mounted SIAC-B UPS with Right-Mounted SIAC-B Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 65 Bottom View Bottom Entry Conduit Landing (Remove plate to drill or punch conduit holes.) UPS with Left-Mounted SIAC-B UPS with Right-Mounted SIAC-B Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 66 A, B, C Phase A (E9) AC Output Phase B (E10) to Critical Load Phase C (E11) Ground Terminals Ground Terminals Front Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 67 A, B, C Phase A (E9) AC Output Phase B (E10) to Critical Load Phase C (E11) Ground Terminals Ground Terminals Front Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 68 (Source 1) A, B, C Phase A (E9) AC Output Phase B (E10) to Critical Load Phase C (E11) Ground Terminals Front Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 69: Figure 37. 93Pm 200 Kw Three-Wire And Four-Wire Siac-B Right-Mounted Bypass - Terminal Locations

    (Source 1) A, B, C Phase A (E9) AC Output to Critical Load Phase B (E10) Phase C (E11) Ground Terminals Front Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 70: Figure 38. 93Pm Siac-B Rib Terminal Detail

    4 4 . . 1 1 1 1 I I n n s s t t a a l l l l a a t t i i o o n n C C h h e e c c k k l l i i s s t t o All packing materials and restraints have been removed from each cabinet. o The SIAC-B is joined to the UPS cabinet. Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 71 Startup and operational checks are performed by an authorized Eaton Customer Service Engineer. o Visit www.eaton.com/pq/register to register your new Eaton UPS / Eaton UPS Accessory. Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 72 Installation Notes _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 73: Figure 39. Two-Breaker Siac-B Internal Oneline

    Input from UPS Inverter Output 480V 3-Phase 480V 3-Phase Output Input Input to SIAC-B Output Terminals Terminals Maintenance to Critical Load Bypass Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 74: Figure 40. Three-Breaker Siac-B Internal Oneline

    480V 3-Phase Output Input Input to SIAC-B Output Terminals Terminals Maintenance to Critical Load Bypass 480V 3-Phase Output to UPS Bypass Input Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 75: Figure 41. Four-Breaker Siac-B Internal Oneline

    93PM-200 3- Wire Figure 44 Single reverse transfer three-wire UPS with 93PM-150 3- external battery and four-breaker three-wire Wire SIAC-B 93PM-200 3- Wire Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 76 93PM-200 4- Wire Figure 47 Single reverse transfer four-wire UPS with 93PM-150 4- external battery and four-breaker four-wire Wire SIAC-B 93PM-200 4- Wire Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 77: Figure 42. Eaton 93Pm 150 Kw Or 200 Kw Ups With Two-Breaker Siac-B (Three-Wire) - System Online

    Onelines and Schematics Figure 42. Eaton 93PM 150 kW or 200 kW UPS with Two-Breaker SIAC-B (Three-Wire) — System Online Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 78: Figure 43. Eaton 93Pm 150 Kw Or 200 Kw Ups With Three-Breaker Siac-B (Three-Wire) - System Online

    Onelines and Schematics Figure 43. Eaton 93PM 150 kW or 200 kW UPS with Three-Breaker SIAC-B (Three-Wire) — System Online Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 79: Figure 44. Eaton 93Pm 150 Kw Or 200 Kw Ups With Four-Breaker Siac-B (Three-Wire) - System Online

    Onelines and Schematics Figure 44. Eaton 93PM 150 kW or 200 kW UPS with Four-Breaker SIAC–B (Three-Wire) — System Online Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 80: Figure 45. Eaton 93Pm 150 Kw Or 200 Kw Ups With Two-Breaker Siac-B (Four-Wire) - System Online

    Onelines and Schematics Figure 45. Eaton 93PM 150 kW or 200 kW UPS with Two-Breaker SIAC-B (Four-Wire) — System Online Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 81: Figure 46. Eaton 93Pm 150 Kw Or 200 Kw Ups With Three-Breaker Siac-B (Four-Wire) - System Online

    Onelines and Schematics Figure 46. Eaton 93PM 150 kW or 200 kW UPS with Three-Breaker SIAC-B (Four-Wire) — System Online Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 82: Figure 47. Eaton 93Pm 150 Kw Or 200 Kw Ups With Four-Breaker Siac-B (Four-Wire) - System Online

    T T h h r r e e e e W W i i r r e e S S c c h h e e m m a a t t i i c c s s Figure Figure 52, and Figure 53 show the SIAC-B three wire schematics. Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 83: Figure 48. Eaton 93Pm 150 Kw Or 200 Kw Three-Wire Siac-B - Two-Breaker Schematic

    Onelines and Schematics Figure 48. Eaton 93PM 150 kW or 200 kW Three-Wire SIAC-B — Two-Breaker Schematic Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 84: Figure 49. Eaton 93Pm 150 Kw Or 200 Kw Three-Wire Siac-B - Three-Breaker Schematic

    Onelines and Schematics Figure 49. Eaton 93PM 150 kW or 200 kW Three-Wire SIAC-B — Three-Breaker Schematic Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 85: Figure 50. Eaton 93Pm 150 Kw Or 200 Kw Three-Wire Siac-B - Four-Breaker Schematic

    F F o o u u r r W W i i r r e e S S c c h h e e m m a a t t i i c c s s Figure Figure 52, and Figure 53 show the SIAC-B four wire schematics. Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 86: Figure 51. Eaton 93Pm 150 Kw Or 200 Kw Four-Wire Siac-B - Two-Breaker Schematic

    Onelines and Schematics Figure 51. Eaton 93PM 150 kW or 200 kW Four-Wire SIAC-B — Two-Breaker Schematic Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 87: Figure 52. Eaton 93Pm 150 Kw Or 200 Kw Four-Wire Siac-B - Three-Breaker Schematic

    Ø) BIB: BYPASS INPUT BREAKER MBP: MAINTENANCE BYPASS BREAKER MIS: MAINTENANCE ISOLATION BREAKER LEGEND Factory Wiring Customer Wiring (105˚C Insulation) (75˚C Insulation) Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 88: Figure 53. Eaton 93Pm 150 Kw Or 200 Kw Four-Wire Siac-B - Four-Breaker Schematic

    Onelines and Schematics Figure 53. Eaton 93PM 150 kW or 200 kW Four-Wire SIAC-B — Four-Breaker Schematic Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 89 Start the UPS. Refer to the applicable Eaton 93PM UPS Installation and Operation manual, listed in paragraph 1.7 For More Information, for UPS operating procedures. Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 90: Figure 54. Eaton 93Pm 150 Kw Or 200 Kw Siac-B (Three Or Four Wire) Breakers - Left-Mounted Siac-B

    SIAC-B Operating Instructions Reinstall the SIAC-B front panel and secure with retained screw. Figure 54. Eaton 93PM 150 kW or 200 kW SIAC-B (Three or Four Wire) Breakers – Left-Mounted SIAC-B RIB (optional) BIB (optional) Bypass Interlock Plate SIAC-B NOTE: The 200 kW UPS is shown.
  • Page 91: Figure 55. Eaton 93Pm 150 Kw Or 200 Kw Siac-B (Three Or Four Wire) Breakers - Right-Mounted Siac-B

    SIAC-B Operating Instructions Figure 55. Eaton 93PM 150 kW or 200 kW SIAC-B (Three or Four Wire) Breakers – Right-Mounted SIAC-B BIB (optional) RIB (optional) Bypass Interlock Plate SIAC-B NOTE: The 200 kW UPS is shown. Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 92 Retain screw for later use. If installed, close the BIB. If installed, close the RIB. Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 93 Transfer the UPS to Normal mode. Refer to the applicable Eaton 93PM UPS Installation and Operation manual, listed in paragraph 1.7 For More Information, for UPS operating procedures. Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 94 SIAC-B Operating Instructions Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 95 Annual preventive maintenance should be performed only by authorized service personnel familiar with maintenance and servicing of the UPS system. Contact an Eaton service representative for more information about service offerings. Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 96 For more information about training and other services, contact the Customer Reliability Center (see paragraph 1.8 Getting Help). Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 97 Output Wiring– Four-Wire Model 4 wire + ground For Three-Wire configurations, see Table 2 Table Output Current For Four-Wire configurations, see Table 4 Table Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 98 Not applicable Acoustical Noise UL 924 for 4-wire 150 kW models Safety Conformance UL1778 4 edition cULus Agency Markings ULus for UL 924 Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 99 For Product installed (and currently located) outside the fifty (50) United States and the District of Columbia, if, in the opinion of Eaton, a Warranted Item is defective, Eaton's sole obligation, at the option of Eaton, will be to refurbish or replace such defective Warranted Item (not including the costs of labor coverage). The defective Warranted Item will be refurbished or replaced onsite at the End-User's location or such other location as determined by Eaton.
  • Page 100 Eaton shall not be responsible for failure to provide service or parts due to causes beyond Eaton's reasonable control. In no case will Eaton's liability under this Warranty exceed the replacement value of the Warranted Items.
  • Page 101 Warranty Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev 08...
  • Page 102 P-16400038708 P-164000387 08...

This manual is also suitable for:

93pm 200 kw siac-b three-wire93pm 150 kw siac-b four-wire93pm 200 kw siac-b four-wire93pm 50 kw siac-b three-wire93pm 100 kw siac-b three-wire93pm 50 kw siac-b four-wire ... Show all