Figure 4-5. Sidecar Conduit And Wire Entry Locations - Eaton 93PM Installation And Operation Manual

20–100 kw (480v) – 100 kw frame
Table of Contents

Advertisement

Top Entry Conduit Landing for AC
Input and Output, and DC Input
(Remove panel to drill or punch
conduit holes.)

Figure 4-5. Sidecar Conduit and Wire Entry Locations

Eaton 93PM UPS (20–100 kW, 480V – 100 kW Frame) Installation and Operation Manual P-164000227—Rev 6
Front
UPS with Left-Mounted Sidecar
Front
UPS with Right -Mounted Sidecar
UPS System Installation
Top Entry Conduit Landing for AC
Input and Output, and DC Input
(Remove panel to drill or punch
conduit holes.)
www.eaton.com/powerquality
4-9

Advertisement

Table of Contents
loading

Table of Contents