Installing Building Alarm And Relay Contact Connections - Eaton 93PM Installation And Operation Manual

Eaton 93pm ups 60–100 kw (480v)
Table of Contents

Advertisement

UPS System Installation
4.8.2

Installing Building Alarm and Relay Contact Connections

NOTE 1
NOTE 2
To install wiring:
1.
Verify the UPS system is turned off and all power sources are removed. See Chapter 6, "UPS Operating
Instructions, " for shutdown instructions.
2.
If not already opened, open the front door by lifting the latch from the bottom and turning to the right
(counterclockwise) and swing the door open.
3.
If wiring the interface terminals from the bottom of the UPS, proceed to Step 8; otherwise, proceed to
Step 4.
4.
Remove the top interface entry conduit landing plates to drill or punch holes (see Figure 4-3).
5.
Reinstall the interface entry plates and install the conduit.
6.
Route the UPS building alarm and relay output interface wiring through the top interface entry conduit
landing plates to the UPS building alarm and relay output terminals. See Figure 4-3 for wiring access
information and Figure 4-11 and Figure 4-12 for UPS interface terminal locations.
7 .
Proceed to Step 13.
8.
Remove the bottom interface entry conduit landing plates to drill or punch holes (see Figure 4-13).
9.
Reinstall the interface entry plates and install the conduit.
10. Route the UPS building alarm and relay output interface wiring through the bottom interface entry conduit
landing plates to the bottom access interface wiring channel along the inside of the front door (see
Figure 4-13).
11. Route the wiring along the interface wiring channel (see Figure 4-13) to the UPS building alarm and relay
output terminals. See Figure 4-11 and Figure 4-12 for UPS interface terminal locations.
12. Secure the wiring to the wire tie anchors provided (see Figure 4-14) using Zip ties.
13. Connect the building alarm interface wiring to the building alarm terminals. See paragraph 3.2.3 and
Table 4-1 for wiring and termination requirements, and Figure 4-15 for terminal assignments.
14. Connect the relay output interface wiring to the relay output terminals. See paragraph 3.2.3 and Table 4-1
for wiring and termination requirements, and Figure 4-16 for terminal assignments.
15. If wiring Minislot connections, proceed to paragraph 4.8.3; if wiring REPO connections, proceed to
paragraph 4.9; otherwise, proceed to Step 16.
16. Close the UPS outside door and secure the latch.
4-14
Eaton 93PM UPS (60–100 kW, 480V) Installation and Operation Manual P-164000227—Rev 2
When installing interface wiring connections, conduit must be installed between
each device and the UPS cabinet.
Disconnect terminal block plugs from terminal blocks to wire plugs.
www.eaton.com/powerquality

Advertisement

Table of Contents
loading

Table of Contents