7. If you are instructed to return the operator information panel assembly, follow all
Installing the operator information panel assembly
To install the replacement operator information panel assembly, complete the
following steps.
1. Read the safety information that begins on page vii and "Installation guidelines"
2. Position the operator information panel assembly so that the tabs face upward
3. Inside the server, connect the cable to the rear of the operator information panel
4. Install the cover (see "Installing the cover" on page 206).
5. Slide the server into the rack.
6. Reconnect the external cables; then, reconnect the power cords and turn on the
Removing and replacing Tier 2 CRUs
You may install a Tier 2 CRU yourself or request IBM to install it, at no additional
charge, under the type of warranty service that is designated for your server.
The illustrations in this document might differ slightly from your hardware.
278
IBM System x3650 M4 Type 7915: Problem Determination and Service Guide
packaging instructions, and use any packaging materials for shipping that are
supplied to you.
Operator information
panel
on page 191.
and slide it into the server until it clicks into place.
assembly.
peripheral devices and the server.