Figure 2-13 Connection Of Pim And Base - NEC NEAX 2000IVS2 Installation Manual

Integrated voice server
Hide thumbs Also See for NEAX 2000IVS2:
Table of Contents

Advertisement

CHAPTER 2 INSTALLATION
Floor Standing Installation
• Connection of PIM and BASE for Fixed/Stationary Equipment
(1) Mount the PIM on the BASE by placing it over the hooks.
(2) Slide the PIM into the inner end.
(3) Fix the PIM to the BASE with three screws.
NOTE:
Screws are attached to the Module.
SCREWS
SLIDE PIM INTO
INNER END.
Page 64

Figure 2-13 Connection of PIM and BASE

BASE
HOOKS
PIM
BASE
2
NEAX2000 IVS
Installation Procedure Manual
ND-70928 (E), Issue 1.0

Advertisement

Table of Contents
loading

This manual is also suitable for:

Neax2000 ivs2

Table of Contents