(4) When the system is two-frame configuration, the Installation cable of the right side frame
can go through the BASE of the left side frame.
Figure 2-6 Installation Cable Wiring for Two-Frame Configuration
TO
AC POWER
DISTRIBUTION
BOARD
CORD BUSH
2
NEAX2000 IVS
Installation Procedure Manual
ND-70928 (E), Issue 1.0
INSTALLATION CABLE
NEUTRAL
FG
LINE
CHAPTER 2 INSTALLATION
Using Installation Cable
NEUTRAL
FG
LINE
BASE
TERMINAL
BLOCKS
Page 53