Figure 2-22 Connection Of 19" Rack Bracket (A) - NEC NEAX 2000IVS2 Installation Manual

Integrated voice server
Hide thumbs Also See for NEAX 2000IVS2:
Table of Contents

Advertisement

CHAPTER 2 INSTALLATION
19-inch Rack Mounting Installation
• Connection of 19" RACK BRACKET (A)
(1) Insert the nails of the 19" RACK BRACKET (A) into the side frame of the PIM.
(2) Secure them with four screws each.
NOTE:
Screws are attached to the 19" RACK BRACKET (A).

Figure 2-22 Connection of 19" RACK BRACKET (A)

19" RACK BRACKET (A)
SCREWS
Page 78
NAILS
2
NEAX2000 IVS
Installation Procedure Manual
ND-70928 (E), Issue 1.0

Advertisement

Table of Contents
loading

This manual is also suitable for:

Neax2000 ivs2

Table of Contents