Figure 003-28 Connecting The Base To The Pim - NEC NEAX 2000 IVS Installation Manual

Hide thumbs Also See for NEAX 2000 IVS:
Table of Contents

Advertisement

NAP 200-003
Sheet 34/37
Installation of Main Equipment
(5) Connect the BASE to the bottom PIM as shown in
PIM
BASE
19" BRACKET
Note:
The MDFM can be connected to the BASE in the same manner as the PIM.
CHAPTER 3
Page 56
Revision 2.0
19" BRACKET
FRONT

Figure 003-28 Connecting the BASE to the PIM

ND-45492 (E)
Figure
003-28.
PIM
BASE

Advertisement

Table of Contents
loading

Table of Contents