Xen Topaz
S
2
E C T I O N
I
NSTALLING THE
E
PCB
XPANSION
S
Trunk/Extension Cabling and Installing the Expansion PCBs
1.5 Cable Routing and Clamping
1. There are two exits (Right and Left) for cables. Clamp and route
cables to outside.
2. Use a blunt object to remove the plastic filler piece(s) at the Sub-
Cover for Cables.
3. Replace the Sub-Cover.
2.1 General
In order to expand the system capacity, up to two 308E/008E
Expansion PCBs can be installed in the KSU.
System Hardware Manual
- 29