2-3 Installing Conduit Fittings Option OP-10 - 14

Affix conduit fittings to the unit following the instructions below.
#
[ 1 ]
Lock nut
[ 2 ]
Gasket
[ 3 ]
Conduit fitting
[ 4 ]
Sealing tape
Procedures
1:
Wind the [4] Sealing tape around the
[3] Conduit fitting.
2:
Insert into the SERIAL hole through
the [2] Gasket.
3:
Tighten it with the [1] Lock nut.