FIGURE 2-5
System board pool
Test: passed
Addition or
Assignment: available
reserva-
tion, DCL
registration
process
Diagnosis
Test: testing
Assignment: assigned
Domain configuration
change process
Test: passed
Assignment: assigned
Connectivity: disconnected
Process of addition into OS
Test: passed
Assignment: assigned
Connectivity: connected
Configuration: unconfigured
2.4.3.2
Flowchart: Deleting a System Board
The flow of DR operations and the transition of system board status when a system
board has been deleted or reserved for deletion are described in the schematic
flowchart, below.
Flow of System Board Addition Processing
registration
or
reservation
Request to add
system board
Error found
Diagnosis
completed
Connection
to domain
Incorpor-
ation into
OS
DCL registration status
Test: passed
Assignment: assigned
Request to add system board,
or domain reboot after
registration/reservation
Error status
Test: fail
Assignment: assigned
Test: passed
Assignment: assigned
Connectivity: connected
Request of
addition into OS
Test: passed
Assignment: assigned
Connectivity: connected
Configuration: configured
Chapter 2 What You Must Know Before Using DR
Add
operation
2-21