Fujitsu Siemens Computers SPARC Enterprise M5000 User Manual page 115

Fujitsu siemens servers dynamic reconfiguration (dr) user's guide
Table of Contents

Advertisement

8. Check the status of the move-destination domain and moved system board.
Execute the showdcl(8) command to check the operation status of the move-
destination domain, and then execute the showboards(8) command to check the
status of the system board and confirm that addition of the system board has
been reserved in the move-destination domain.
XSCF> showdcl -d 0
DID
LSB
XSB
00
00
00-0
01
00-1
02
01-0
XSCF> showboards 01-0
XSB
DID(LSB)
------------------------------------------------------------------
01-0
00(02)
9. Add the system board to the move-destination domain.
Execute the addboard(8) command to add the system board to the move-
destination domain. If the move-destination domain is in stopped status, the
system board will be added the next time the domain is booted.
XSCF> addboard -c configure -d 0 01-0
10. Check the status of the move-destination domain and moved system board.
Execute the showdcl(8) command to check the operation status of the move-
destination domain, and then execute the showboards(8) command to check the
status of the moved system board.
XSCF> showdcl -d 0
DID
LSB
XSB
00
00
00-0
01
00-1
02
01-0
XSCF> showboards 01-0
XSB
DID(LSB)
------------------------------------------------------------------
01-0
00(02)
Status
Running
Assignment
Pwr
Conn
Assigned
y
n
Status
Running
Assignment
Pwr
Conn
Assigned
y
y
Conf
Test
Fault
n
Passed
Normal
Conf
Test
Fault
y
Passed
Normal
Chapter 4 Practical Examples of DR
4-25

Advertisement

Table of Contents
loading

Table of Contents