Generating A Work Order - 3Com WX4400 Reference Manual

Wireless lan mobility system wireless switch manager
Hide thumbs Also See for WX4400:
Table of Contents

Advertisement

Generating a Work
Order
A work order provides all of the necessary information for the physical
installation of the 3Com Mobility System. A work order shows where the
MAP access points should be installed, WX initial setup configuration
information, and projected RSSI information that is useful when verifying
the installation.
The work order has meaning only after you add planning information.
(See "Planning the 3Com Mobility System" on page 75.)
1 Select the Reports tool bar option.
2 In the Reports list, select Work Order.
3 Select the scope for the work order. You can select the network plan, a
site, a building, or an individual floor.
4 Select the options you want to use for the report:
RF Coverage
RSSI Projections
Display Disabled MAPs (only available if RSSI Projections is
selected)
Display RF Coverage On Entire Floor (only available if RSSI
Projections is selected)
Display Unreachable MAPs (only available if RSSI Projections is
selected)
Display MAPs on Other Floors (only available if RSSI Projections is
selected)
5 Select the language:
English
German
6 To change the output directory for the report, click on the button next to
output directory, navigate to the new directory, and click Select.
7 Click Generate.
8 When the report is generated, click View. A browser window containing
the report opens.
9 Optionally, select the floor.
10 Click View Work Order.

Generating a Work Order

433

Advertisement

Table of Contents
loading

Table of Contents