Chapter 3: Unpacking - Honeywell VFD CORE Installation Instructions Manual

User and application manual
Hide thumbs Also See for VFD CORE:
Table of Contents

Advertisement

CHAPTER 3: UNPACKING

The VFD should be kept in the shipping carton or crate before installation. In order to retain the warranty coverage, the VFD should
be stored properly when it is not to be used for an extended period of time.
The frame size D and size E VFDs are packed in crates. Follow the instructions below for unpacking.
Frame D
Crate (HCRDXXXXXD1000T)
1. Loosen all the screws on the four iron plates at the four
bottom corners of the crate. Four screws are on each of
the iron plates.
2. Remove the crate cover, EPEs, rubber and manual.
3. Loosen the 10 screws on the pallet, then remove the
M33234
4. Lift the drive by hooking the lifting holes. It is now ready
M33235
15
wooden plate.
for installation.
M33236
M33237
63-4528-04

Advertisement

Table of Contents
loading

Table of Contents