Maintenance; Cleaning And Checking; Maintenance 10.1 Cleaning And Checking - Duerkopp Adler 511 Operating Instructions Manual

Cnc automat for bartacking seams and short seams
Table of Contents

Advertisement

10. Maintenance

10.1 Cleaning and checking

Maintenance required
Maintenance work
Machine head
- Remove sewing dust and
residual thread (you can use
compressed air).
Control box
88
Caution – Risk of Injury !
Turn the main switch off.
Maintenance work of the automatic bartacker must only be
carried out when the machine is switched off.
All maintenance work must be carried out before or at the maintenance
intervals defined in the table (refer to the "operational hours" column).
When working with materials that are thick and fibrous, shorter
maintenance intervals may be required.
A clean automatic bartacker helps to prevent malfunctions.
1
Explanation
Important points to be cleaned:
- The area under the throat plate
- The area around the hook 1
- The bobbin enclosure
- The thread trimmer
- The area around the needle 2
- Clean fan grill
2
Operational interval
8
8

Advertisement

Table of Contents
loading

Table of Contents