4.5 Wait Operation

Parameters
4--16
• "Wait" is the operation of not advancing the program steps and wait-
ing for the PV to enter the preset wait width at the end of each step.
During wait operation, the "WAIT" LED lights.
SP
PV
During wait
Counting stop
• As the PV is smaller than "SP - wait width" at the end of the rising
step in the above figure, control monitoring is stopped, and the con-
trol waits for PV to reach "SP - wait width" before the step is up-
dated.
• In the case of a falling step, the control waits for PV to reach "SP +
wait width."
• Set the wait width in the "wait width" parameter (expansion mode)
within the range 0 to 9999 (EU). (Default is "0".)
• Setting the "wait width" to "0" disables wait operation.
Symbol
Parameter Name: Mode
Wait width
Wait width
Wait width
Step updated
Time
Description
: Expansion

Wait operation

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the E5EK PROGRAMMABLE TYPE and is the answer not in the manual?

Questions and answers

Jos Janssens
March 4, 2025

Change output pulse lenght

This manual is also suitable for:

E5ek-tE5ek

Table of Contents