Step 6: Trial Operation
1, 2, 3...
TUS indicator on the Duplex Unit will flash for 40 seconds before light-
ing.
1. Start operation from the CX-Process Tool (using Operation – Run/Stop
Command from the Execution Menu) or turn the PLC OFF and ON. (See
section 4-4.)
2. Monitor status with the CX-Process Tool (using Operation – Monitor Run
Status from the Execution Menu) and check the load rate, for example.
(See section 4-5.)
3. Check the connections with the CX-Process Tool (using Start from the Vali-
date Action Menu). (See section 4-6-3.)
4. Tune parameters such as PID constants and make SP settings with the CX-
Process Tool.