6.2 Installation work

The following prerequisites must be met before carrying out assembly work, and all preparation work must be
completed first.
Tool
Adjustable wrench
Water pump pliers
Spirit level
1.
Select and set up the place of installation according to the specifications in section "4.8
Assembly conditions" on page 51.
2.
The condensate inlet line provided by the customer must be depressurized and locked and
tagged out to prevent unintentional pressurization.
3.
Have the necessary tools and materials ready.
4.
Provide required connection materials suitable for the pressure range and temperature range.
5.
Check the product for damage. Use the product only in undamaged condition.
INFORMATION QWIK-PURE
i
Preconditions
Sealing material (e.g. PTFE tape)
for sealing the condensate
connections provided by the
customer
Hose clamps
Hose for condensate and
compressed air
Vaseline supplied
Preparatory work
iCS 550 ... 2200 assembly!
®
Start assembling the QWIK-PURE
The collector of the QWIK-PURE
installation.
Skip steps 1 through 7.
Material
iCS 550 ... 2200 from step 8.
®
iCS 550 ... 2200 is delivered ready for
®
QWIK‑PURE
Protective equipment
To be worn at all times: