Installation Work - Beko CLEARPOINT 3eco S040 Original Installation And Operating Manual

Coalescing filter
Table of Contents

Advertisement

Installation and operation instructions

7.2 Installation work

The following requirements must be fulfilled to carry out assembly work and preparatory work must be completed.
Tool
Screwdriver - Philip's head size 2.5
mm
Remove the dust cap from the following threads:
1.
Inlet and outlet on the filter head
Condensate drain on the filter base
2.
Depressurize pipeline system or relevant pipe section.
Observe the filter dimensions and ensure required space for installation. 
3.
See "6. Dimensions" on page 28.
Pipelines must be able to support the additional weight of the filter. Additional attachments should be mounted 
4.
if necessary.
Pipelines must be free from contamination and corrosion. Check pipe threads for damage. Defective pipes must
5.
be replaced promptly.
Pipelines must be free from mechanical tension and vibration. Compensate for vibrations by using vibration
6.
dampers.
Only use fittings suitable for this pressure and temperature range. The pipeline threads must match those on 
7.
the filter head.
Design the condensate drain such that no fluid or condensate can escape into the area around the filter. 
8.
The condensate to be drained should be fed to a legally compliant treatment plant (e.g. ÖWAMAT
BEKOSPLIT
).
®
Preconditions
Material
Additional installation and
operating instructions for
accessories used
Sealing material such as PTFE strip
(EN 837-2)
Preparatory work
CLEARPOINT
3eco
coalescing filter
®
Protective equipment
Protective gloves (liquid-
resistant)
Safety glasses with side
protection (goggles)
Hearing protection
Class FFP 3 respirator
Safety shoes
or
®
31 | 60

Advertisement

Table of Contents
loading

Table of Contents