Installation and operating manual

4.8 Assembly conditions

Observe the following conditions when setting up and selecting the place of installation:
The place of installation must meet the following conditions:
0 Indoors
0 Protected from mechanical loads
0 Protected from splash water
0 Protected from direct sunlight and areas exposed to heat sources
0 Protected from frost
0 Outside of hazardous locations
The setup area must be level (gradient ≤18 mm/m (1/3 in/ft)) and smooth.
The setup area's load capacity must be suitable for the maximum operating weight of the
QWIK-PURE
iCS (refer to section "4.1 QWIK-PURE® iCS operating parameters" on page 42).
®
The setup area must be sealed, or a suitable spill protection basin must be in place.
0 In the event of damage, no untreated condensate or oil may get into the sewer system or the soil.
0 All locally applicable standards and regulations regarding the protection of bodies of water must be
complied with.
Bumper guards must be installed if the product is being set up in the vicinity of traffic routes.
A compressed air supply line provided by the customer must be available and equipped with a
maintenance unit (pressure reducer and filter). 
The cross-sectional area of the condensate collection line must be greater than G1" (Ø = 25 mm).
Route the condensate collection line with a gradient ≥ 50 mm/m (2/3 in/ft) to the place of installation for 
the QWIK-PURE
iCS.
®
The manufacturer recommends installing a P-trap at the wastewater connection in order to prevent
unpleasant odors.
The manufacturer recommends installing a 3-way valve at the tapping point on the condensate collection
line to divert the condensate inlet into a separate container during maintenance work.
50 mm/m
2/3 in/ft