QWIK‑PURE
®
iCS
Image
1.
Dry the cleaned assembly with a cotton cloth.
2.
Transport the cleaned and dried assembly unit to the place of installation of the
QWIK-PURE
3.
Put the QWIK-PURE
108 | 132
Follow-up work
iCS and mount it.
®
iCS back into operation (see section "8. Commissioning" on page 72).
®
Installation and operating manual
Description / explanation
Clean FRC
Carefully wipe clean the sensor tubes of the
following sensors with a damp cloth.
•
Sensor High Level Alarm (HLA)
•
Sensor High Level (HL)
•
Sensor Low Level (LL)
Clean pressure relief chamber
Flush the pressure relief chamber with warm water.