Installation and operation manual
7.2 Assembly work
For assembly work to be carried out, the following prerequisites must be fulfilled and the preparatory tasks must have
been completed.
Tools
•
Screwdriver - cross-head size 2.5
mm
Remove the dust cap from the following threads:
1.
•
Inlet and outlet on the housing head
•
Condensate drain on the housing base
2.
Depressurise the pipelines or relevant pipe section.
Note the separator dimensions and make sure there is sufficient space for set up.
3.
See "6. Dimensions" on Page 24.
Pipes must be able to bear the additional weight of the separator. Additional fixings must be mounted if
4.
necessary.
Pipes must be free of contamination and corrosion. Check pipe thread for damage. Defective pipes must be
5.
replaced immediately.
Pipes must be free of mechanical stress and corrosion. Compensate any vibrations which occur by using
6.
vibration dampers.
Only use fittings which are suitable for this pressure and temperature range. The pipe threads must match
7.
those of the housing head.
Execute the condensate drain in such a way that no compressed gas or condensate can escape to the
8.
surrounding of the separator. The condensate to be discharged should be routed to a processing system
conforming to law (e.g. ÖWAMAT
Prerequisites
Material
•
Additional installation and
operating manual for the
accessories used
•
Sealing materials such as e.g. PTFE
tape (EN 837-2)
Preparation of installation
or BEKOSPLIT
).
®
®
CLEARPOINT
water separator
®
Protective equipment
•
Protective gloves (fluid-
resistant)
•
Safety goggles with side shields
•
Hearing protection
•
Respiratory protection,
protection class FFP 3
•
Safety footwear