Beko QWIK-PURE CS Installation And Operating Manual page 100

Table of Contents

Advertisement

QWIK‑PURE
®
iCS
Image
100 | 132
Installation and operating manual
Description / explanation
The discharge process is started.
0 The piston in the FRC will close the
condensate inlet from the pressure relief
chamber into the FRC.
0 The measuring chamber is supplied with
auxiliary air at timed intervals.
0 The condensate is passed into the filter 
cartridges. This takes several minutes.
0 The status LED STATUS BAR flashes blue 
and indicates the remaining time until the
service.
Status LED STATUS BAR
4/4 of the length flashes blue
3/4 of the length flashes blue
2/4 of the length flashes blue
1/4 of the length flashes blue
When the minimum filling level in the measuring 
chamber is reached, the discharge process stops.
0 The piston in the FRC will open the
condensate inlet from the pressure relief
chamber into the FRC.
0 The status LED STATUS BAR is permanently
lit blue.
0 The measuring chamber is no longer
pressurized with auxiliary air.
3. Cut off the compressed air supply and secure it 
against unintentional opening.
4. Carefully depressurize the compressed air hose
at the compressed air connection.
5. Disassemble the compressed air hose.
Remaining time
100%
75%
50%
25%

Advertisement

Table of Contents
loading

Table of Contents