Commissioning work
Description / explanation
5. Remove the cover from the pressure relief
chamber and remove the activated carbon mat
from the vent of the pressure relief chamber.
6. Fill the pressure relief chamber with tap water
via the vent.
0 Stop filling as soon as the FRC performs a
discharge operation.
7. Insert the activated carbon mat into the vent of
the pressure relief chamber and place the cover
on the pressure relief chamber.
8. Slowly open the condensate feed to the
QWIK-PURE
9. Check all hoses and connections for leaks (see
section "10.3.7 Leakage test" on page 109).
10. Commissioning is complete and the discharged
condensate is treated by the QWIK-PURE
QWIK‑PURE
iCS.
®
iCS
®
iCS.
®