Initial Commissioning - Beko QWIK-PURE CS Installation And Operating Manual

Table of Contents

Advertisement

Installation and operating manual

8.2 Initial commissioning

For initial commissioning work to be carried out, the following prerequisites must be fulfilled and the 
preparatory tasks must have been completed.
Tool
No tool necessary
1.
Assembly of the QWIK-PURE
2.
Electrical installation of the QWIK-PURE
Image
NOTICE
3 sec
3 sec
Preconditions
No material necessary
Preparatory work
iCS is complete.
®
Commissioning work
Configuring the number of filter cartridges!
Entering the wrong number of filter cartridges may result in property damage, 
environmental damage or impaired operation.
Make sure to set the correct number of filter cartridges being used.
Material
iCS is complete.
®
Description / explanation
As soon as the power supply is established, the
LED FILTER CARTRIDGE SELECTION and the LED
NUMBER OF FILTER CARTRIDGES will flash green.
1. Press the Service button and hold it down for
3 seconds in order to set the number of filter 
cartridges being used.
0 The LED NUMBER OF FILTER CARTRIDGES
will switch from the current flashing number 
to the next higher number (e.g., from 1 to 2).
2. Repeat this step until the correct number of
installed filter cartridges is set.
QWIK‑PURE
Protective equipment
To be worn at all times:
iCS
®
73 | 132

Advertisement

Table of Contents
loading

Table of Contents