7.2 Installation work
The following requirements must be fulfilled to carry out installation work and preparatory work must be completed.
Tool
•
Screwdriver - Philip's head size 2.5
mm
Remove the dust cap from the following threads:
1.
•
Inlet and outlet on the housing head
•
Condensate drain on the housing base
2.
Depressurize pipeline system or relevant pipe section.
Observe the separator dimensions and ensure required space for installation.
3.
See "6. Dimensions" on page 24.
Pipelines must be able to support the additional weight of the separator. Additional attachments should be
4.
mounted if necessary.
Pipelines must be free from contamination and corrosion. Check pipe threads for damage. Defective pipes
5.
must be replaced promptly.
Pipelines must be free from mechanical tension and vibration. Compensate for vibrations by using vibration
6.
dampers.
Only use fittings suitable for this pressure and temperature range. The pipeline threads must match those on
7.
the housing head.
Design the condensate drain such that no compressed gas or condensate can escape into the area around the
8.
separator. The drained condensate should be fed into a legally conforming preparation system (e.g. ÖWAMAT
or BEKOSPLIT
).
®
Preconditions
Material
•
Additional installation and
operating instructions for
accessories used
•
Sealing material such as PTFE strip
(EN 837-2)
Preparatory work
CLEARPOINT
Water separator
®
Protective equipment
•
Protective gloves (liquid-
resistant)
•
Safety glasses with side
protection (goggles)
•
Hearing protection
•
Class FFP 3 respirator
•
Safety shoes
®
27 | 56