Abbott aim Technical & Service Manual page 53

Table of Contents

Advertisement

Section 5, Maintenance and Service Tests
5.3.3
Delivery Test
This test verifies the motor operation through a "dry" test that measures motor turns or through a
"wet" test that measures fluid delivered.
5.3.3.1
Pump programming
Install four AA batteries. Switch the pump on and wait for the self-test to complete. Because only
batteries are in use, the following display appears:
USING
BATTERIES
Press [ENTER].
ENTER
TO
CONFIRM
1 TPN
Press [2] to select pain management therapy.
2 PAIN MANAGEMNT
3 INTERMITTENT
USE
FOR MORE
1 INTRAVENOUS
Press [2] to select epidural mode.
EPIDURAL
3 SUBCUTANEOUS
CONTINUOUS
Press [2] to select bolus only delivery.
BOLUS
ONLY
3 CONT.
+ BOLUS
1 SELECT
mg/mL
Press [3] to select mL as the delivery unit.
2 SELECT
ug/mL
3
SELECT
mL
PROGRAM
A
Press [YES] to program a loading dose.
LOADING
DOSE?
YES
OR
NO
SET
LOADING
DOSE
For Dry Test: Press [1] [0] and [ENTER] to select 10 mL.
0.0 mL
For Wet Test: Press [2] [0] and [ENTER] to select 20 mL.
ENTER WHEN
DONE
DELIVER
THE
Press [NO] to save the loading dose for later delivery.
LOADING
DOSE
NOW?
YES OR NO
AIM/AIM Plus Technical Service Manual
5-21
430-600035-002 (Rev. 1 1/99)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Aim plus13038-0413967-04

Table of Contents