Performing The Data Link - Mitsubishi Electric L26CPU-BT User Manual

Melsec-l cc-link system master/local module
Hide thumbs Also See for L26CPU-BT:
Table of Contents

Advertisement

12.2.5

Performing the data link

Turn on the local stations first, and then the master station to start the data link.
(1) Confirming the operation with the LED indicators
The following diagram shows the LED status of the master station and the local station when the data link is
being performed normally.
(a) LED indication of the master station
Make sure that the LEDs are as follows:
Controlling data link
Module is normal
(b) LED indication of the local station
Make sure that the LEDs are as follows:
Module is normal
The data link is being performed
normally
308
On
Off
Sending data
The data link is being performed
normally
Receiving data
On
Off
Sending data
Receiving data

Advertisement

Table of Contents
loading

This manual is also suitable for:

L26cpu-pbtLj61bt11

Table of Contents