4 Installation
4.2 Site preparation
4.2.4 Media supply
4.2.4
Media supply
Supply must be arranged so that piping dimensions, piping lengths, valves and height
differences do not obstruct processing.
See
Section 8.1 Specifications, on page 225
regarding requirements on media supply
and delivery.
ÄKTA readyflux Operating Instructions 29175550 AG
86
Need help?
Do you have a question about the AKTA readyflux and is the answer not in the manual?