cytiva AKTA readyflux Operating Instructions Manual page 171

Hide thumbs Also See for AKTA readyflux:
Table of Contents

Advertisement

Step
2
3
4
Monitor the flow kit installation test
The progress of the installation test can be followed in UNICORN 7.6 or later versions.
Charts will display the response curves for different sensors. Any time during the test
run it is possible to manually add run notes that will be included in the report. To open
the Run Notes dialog box, click View →Documentation.
Flow kit installation test report
Two test reports are generated when the test is finished.
• A UNICORN result file with a name containing Installation Test Flow
Kit which can be accessed using the Evaluation module.
ÄKTA readyflux Operating Instructions 29175550 AG
Action
Select File →New Method and select the appropriate Flow Kit Installation
Test for the used flow kit type from the dropdown menu of predefined
methods.
For flow kit plus configuration, update the pH calibration slope and zero
point values in AE121_pH calibration settings block located in test
instructions tab of method and save.
Run the method.
5 Operation
5.2 Flow kit installation
5.2.5 Flow kit installation test
171

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the AKTA readyflux and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents

Save PDF