cytiva AKTA readyflux Operating Instructions Manual page 151

Hide thumbs Also See for AKTA readyflux:
Table of Contents

Advertisement

Step
2
3
Note:
ÄKTA readyflux Operating Instructions 29175550 AG
Action
Close the pump heads of transfer pump P-202 and permeate pump P-203
as follows:
• Move the lever to the right (clockwise).
Turn the FLOW KIT INSTALL - RUN - INTEGRITY TEST selector switch to
the RUN position.
FLOW KIT
RUN
INSTALL
Note:
Software can only start when RUN is selected.
Click the END button in the UNICORN System Control dialogue to
complete the flowkit installation wizard.
INTEGRITY
TEST
5 Operation
5.2 Flow kit installation
5.2.3 Install the CFF flow kit
151

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the AKTA readyflux and is the answer not in the manual?

Table of Contents

Save PDF